KliMoPlanElbe

Climate-friendly modernisation plans for Hamburg’s swimming pools at the Elbgaustraße pilot site

© Adobe Stock | Ardan Fuessmann
Copyright: Adobe Stock | Ardan Fuessmann

The project aims to develop a climate-friendly modernisation plan for Hamburg’s swimming pools at the pilot site on Elbgaustraße. Opened in 1975, the swimming pool is energy-inefficient, incurs high running costs and, after more than 50 years of operation, shows signs of age-related and structural damage.
During the DESIGN phase, a concept is to be developed that encompasses a far-reaching energy-efficiency refurbishment. This includes replacing the existing gas-fired boiler systems with an air-source heat pump in combination with PV systems and buffer storage tanks. The KliMoPlanElbe team also identifies significant potential for savings through the energy-efficiency refurbishment of the building envelope and the comprehensive optimisation of the ventilation systems. Two options are being examined for a sustainable energy supply: decentralised self-sufficiency and the establishment of a local heating network with the swimming pool as the anchor customer. The concept is intended to be transferable to other indoor swimming pools, particularly in Hamburg, and to serve as a blueprint.

Further information can be found on the project page: https://www.forschungsnetzwerke-energie.de/de/wettbewerb-urban-wave-stadtbad-der-zukunft

 

Duration
-
Budget
99.999 €
In cooperation with
Bäderland GmbH
GP-JOULE Wärme GmbH & Co. KG